Utility

124th Avenue Extension

Tualatin, OR

124th Avenue Extension was part of the Washington County road project which included 14,000 LF of 66″ Welded Steel Transmission Main. 

Close Project
  • + Pipe was approximately 14,000 lineal feet of new 66″ welded steel
  • + Pipe is part of overall Willamette Water Supply Program new 30 miles of pipe from Wilsonville to Hillsboro
  • + Project was a coordinated effort between Washington County and the Willamette Water Supply Program
  • + Trenching included solid rock requiring drilling and blasting
Close
Close
Close Project

+ Pipe was approximately 3,850 lineal feet of new 48″ welded steel
+ Pipe is part of overall Willamette Water Supply Program new 30 miles of pipe from Wilsonville to Hillsboro
+ Project was a coordinated effort between a private developer for the South Hillsboro Master Planned Community and the Willamette Water Supply Program

Utility

PWL1.1 Willamette Water Supply

Hillsboro, Oregon

Two sections of the Willamette Water Supply Program pipeline at Reed’s Crossing were installed in coordination with improvements being made to Cornelius Pass Road. A portion of the pipeline was placed under the Cornelius Pass/TV Highway intersection in coordination with the improvements being made to the Cornelius Pass/TV Highway Intersection project. Another portion of the pipeline was placed in the future Cornelius Pass Road extension, south of TV Highway. The pipeline consists of over 3,850 lineal feet of 48” welded steel pipe including valves, turn-outs and connections.

Close
Close
Utility

Cherry Street

Hillsboro, Oregon

Two sections of existing storm drain were updated. A twin section of 48″ RCP was installed along 231st Avenue at Century Drive. The second section was the extension of Cherry Street to Ray Circle. This connection included a bottomless box across an existing creek. Work required the installation of a sheet pile wall to protect the existing creekbed. A three-sided box culvert was placed over the existing creekbed. Upon completion of the box culvert, Cherry Street was extended to connect to Ray Circle.

Close Project

+ Install approximately 1,000 lineal feet of new 24″-42″ RCP
+ Excavate approximately 4,000 cy for new creek crossing
+ Install 1,300 sf of sheet pile wall and 80 lf of new three-sided box culvert

Close
Close
Close Project

+ Excavation and embankment of 250,000 bcy
+ 3,000 feet of new 8″ and 12″ sanitary sewer
+ 17,000 feet of storm sewer mainline
+ 9,000 feet of new waterline
+ 30,000 tons of base rock
+ 7,500 tons of asphalt

Utility

Scouters Mountain

Happy Valley, Oregon

Work included installation of new santiary sewer, storm sewer and waterline for new 200 lot subdivision located at the former Scouters Mountain in Happy Valley, Oregon. Quantities included 3,000 feet of new 8″ and 12″ sanitary sewer, 17,000 feet of storm sewer mainline, and 9,000 feet of new waterline, including all connections, services, detention and treatment systems.

Close
Close
Utility

Northwest Groveland Drive to Helvetia Road

Washington County, Oregon

This project constructed a new two lane roadway that realigned Groveland Drive starting east of Groveland Road and re-connecting to Helvetia Road at the current intersection with Schaaf Road. Project will route stormwater runoff through a water quality swale prior to discharging off the site. The project also replaced the existing bridge with an 15 ft x 8 ft Aluminum Arch culvert on Helvetia Road at Waible Creek. The replacement of the culvert was unique in that we prebuilt sections in the project staging area and then carried them in with a loader and it was backfilled with a low density Cellular concrete. Key items of work included  9,250 SY of Cement Treated base 14 inches in depth, 625 cy of low density cellular concrete, 300 ft of 15 ftx8ft Aluminum Culvert, 2,900 Tons of HMAC.

Close Project

+ Excavtion and embankment of 2,500 bcy
+ 300 feet of structural arch plate culvert with CDF backfill
+ Sheet pile headwalls
+ Stream restoration for fish passage

Close