Utility

Segment 3B Waterline

Wilsonville, Oregon

This project involved installation of a water transmission main through a sensitive area near the Boeckman Creek Slough and Wetland. 

Close Project
  • + Pipe was approximately 2,500 lineal feet of new 48″ welded steel
  • + The new waterline is an extension of the existing 48″ waterline installed by Kerr Contractors in 2002
  • + Work areas were limited and trench conditions required extensive dewatering during pipe installation
  • + Erosion control and protection of the sensitive work areas and the surrounding wetland areas was a project priority
Close
Close
Close Project
Utility

Ridgewood View Park Reservoir

Beaverton, Oregon

Kerr Contractors performed the installation of new transmission pipe including two major connections to existing systems and new eight million gallon reservoir. Over 6,600 lineal feet of welded steel water transmission main pipe was put in place. Installation included residential neighborhoods with limited access and traffic constraints and a new public park. The work also included deep connections to new reservoir.

 

Close
Close
Utility

Northwest Groveland Drive to Helvetia Road

Washington County, Oregon

This project constructed a new two lane roadway that realigned Groveland Drive starting east of Groveland Road and re-connecting to Helvetia Road at the current intersection with Schaaf Road. Project will route stormwater runoff through a water quality swale prior to discharging off the site. The project also replaced the existing bridge with an 15 ft x 8 ft Aluminum Arch culvert on Helvetia Road at Waible Creek. The replacement of the culvert was unique in that we prebuilt sections in the project staging area and then carried them in with a loader and it was backfilled with a low density Cellular concrete. Key items of work included  9,250 SY of Cement Treated base 14 inches in depth, 625 cy of low density cellular concrete, 300 ft of 15 ftx8ft Aluminum Culvert, 2,900 Tons of HMAC.

Close Project
Close
Close
Close Project
Utility

Reed’s Crossing Waterline

Hillsboro, Oregon

In the summer of 2017, two sections of the Willamette Water Supply pipeline at Reed’s Crossing were installed in coordination with improvements being made to Cornelius Pass Road. A portion of the pipeline was placed under the Cornelius Pass/TV Highway intersection in coordination with the improvements being made to the Cornelius Pass/TV Highway Intersection project. Another portion of the pipeline was placed in the future Cornelius Pass Road extension, south of TV Highway to Blanton Road, along the Cornelius Pass Road extension. Pipeline consists of over 2,100 lineal feet of 48” welded steel pipe including valves, turnouts and connections.