Tractor Supply needed to construct a road widening and left turn pocket on OR 213 to support their new location in Molalla. Work was coordinated with the Oregon Department of Transportation for road closures necessary to install an 8 FT x 10 FT box culvert, replacing an existing steel culvert. Other work creek and channel improvements, road widening, and added illumination. All work in Bear Creek was performed during the 60-day, in-water work window.
Two sections of the Willamette Water Supply Program pipeline at Reed’s Crossing were installed in coordination with improvements being made to Cornelius Pass Road. A portion of the pipeline was placed under the Cornelius Pass/TV Highway intersection in coordination with the improvements being made to the Cornelius Pass/TV Highway Intersection project. Another portion of the pipeline was placed in the future Cornelius Pass Road extension, south of TV Highway. The pipeline consists of over 3,850 lineal feet of 48” welded steel pipe including valves, turn-outs and connections.
Work included installation of new santiary sewer, storm sewer and waterline for new 200 lot subdivision located at the former Scouters Mountain in Happy Valley, Oregon. Quantities included 3,000 feet of new 8″ and 12″ sanitary sewer, 17,000 feet of storm sewer mainline, and 9,000 feet of new waterline, including all connections, services, detention and treatment systems.
We are passionate about what we do every day. Our five Core Values are the cornerstone which we refer to as “The Kerr Way”. These Core Values provide, without question, the standards by which we conduct ourselves.