Sherwood Commerce Center – Phase 1 is a three-building 435,107 square feet development in Sherwood, Oregon. The project started in fall of 2022 and is expected to be complete in Spring of 2024. The Developer is designing a state-of-the-art industrial facility. Phase 1 of the three-building Sherwood Commerce Center will be constructed on a 27.64-acre lot on Southwest Oregon Street, near the intersection with Tualatin-Sherwood Road. This building will have contiguous spaces ranging from 5,200 square feet to 172,007 square feet. Phase 2 will largely mirror Phase 1, doubling the size of the facility. Phase 2 started in the Summer of 2023 and will likely be completed in 2025.
Tualatin Sherwood Corporate Center is a new 32-acre multi-building commercial development located in Sherwood, Oregon. Work includes complete site development for over 500,000 square feet of commercial space. The project was started in late October of 2020 and the Kerr army took over sitework operations in order to get the site stabilized to allow operations to continue through the winter.
This intermodal yard is located in Portland, Oregon. The scope of work was the redevelopment of a 47 acre, 100 year-old rail yard. Work included the demolition of existing buildings and rail facilities and construction of a new administration building, new entry and exit portals, new yard entrance, new intermodal truck access and new rail facilities. Demolition activities expose significant amounts of remnant steel and other debris which required active efforts to separate from the existing subsurface soils. Soil conditions and schedule required extensive cement treatment of on-site to obtain the necessary strength during all weather conditions.
Legion Park is Woodburn’s oldest park site covering almost 16 acres. Identified in the 2009 Parks and Recreation Master Plan, 2014 Legion Park Master Plan, and the 2016 Parks and Recreation SDC methodology, the Legion Park Project has long been a City priority. Through various government and industry grants, the City of Woodburn was able to build a top-notch artificial turf soccer facility, a covered stadium, and LED field lighting. In addition, the project will include four lighted pickle ball courts and two basketball/ futsal courts, state-of-the-art interactive play features, and improvements to the concession stand and parking lot.
Improvements for railyard surfacing that include removing all existing asphalt paving, cement treating existing subgrade surface, placing new aggregate base section and repaving section. Work also included rail pavement infill and crossings.