Robert Creek June 2019 Update

Clearing the brush and trees on the 56 acre site began in February 2019. The heart of the job is excavating over 700,000 cubic yards of material making way for a third, southbound, truck climbing lane. The site consists of many challenges including steep terrain, rock excavation, a creek realignment, box culvert installation, retaining walls, horizontal drains and repaving several miles of I-5.

Despite these challenges, the Kerr team has successfully moved over 50,000 CY of material to-date and is continuing to increase production each day.

Great aerial shots care of Quinn Cox.