Tualatin Sherwood Road (Olds – Teton)
Tualatin Sherwood is a major highway connecting Sherwood and Tualatin as well as a cutoff from OR99W. This nearly three mile section of existing Tualatin Sherwood will be expanded to four lanes with a center turn lane, bicycle and pedestrian facilities, storm drain upgrades and street lights. During construction of the roadway, the Willamette Water Supply, as part of this contract, will be installing the connecting section of 66” welded steel pipe as part of the Willamette River water connection from Wilsonville into Hillsboro.
- Excavation 49,000 cy
- Sanitary sewer 800 ft
- Storm drain 24,000 ft
- 66” welded steel waterline 13,000 lf
- Block wall 16 each
- Cast-in-place walls 9 each
- Aggregate base 50,000 tons
- Asphalt paving 35,000 tons
- Traffic signal 7 each
The Kerr Way
Kerr Contractors meets all challenges as a team. This includes specialists from within the organization and from trusted resources outside the company. Teams built from from the same values and corner stone produce high quality with speed.
Everything we do is based upon the simple idea that we do the right thing for our customer, no matter the cost. We do this for ourselves and everyone we work with on the team.
Kerr Contractors was founded on the belief that finding a better way is not just a matter of distinction, but of survival. The culture is built upon the passion of finding a better way to deliver everything we do.
Each action builds on the idea that you own it until you deliver it. The culture that permeates the company strives to hold everyone accountable and to set a high standard of conduct and accomplishment.
Your success is built upon enduring relationships with trusted construction specialists. These strong relationships deliver value to the customer and spawn future growth and opportunity.