Slip Lining Existing Effluent Line
This was a design-build project. Work included slip lining approximately 3,750 of ocean effluent line at Nye Beach. Kerr Contractors worked directly with the Owner’s engineer to design and determine means and methods for slip lining the existing effluent line. Work involved staging and welding 20″ HDPE pipe along a heavily populated beach during peak tourist season. Construction required significant coordination with Owner, City of Newport, State Lands and local businesses to develop a workable schedule for construction. During periods of favorable tides, Kerr Contractors worked 24X7 to successfully complete the slip lining. Normal paper plant operations were not impacted during construction.
The Kerr Way
Kerr Contractors meets all challenges as a team. This includes specialists from within the organization and from trusted resources outside the company. Teams built from from the same values and corner stone produce high quality with speed.
Everything we do is based upon the simple idea that we do the right thing for our customer, no matter the cost. We do this for ourselves and everyone we work with on the team.
Kerr Contractors was founded on the belief that finding a better way is not just a matter of distinction, but of survival. The culture is built upon the passion of finding a better way to deliver everything we do.
Each action builds on the idea that you own it until you deliver it. The culture that permeates the company strives to hold everyone accountable and to set a high standard of conduct and accomplishment.
Your success is built upon enduring relationships with trusted construction specialists. These strong relationships deliver value to the customer and spawn future growth and opportunity.