OR213 at MP 15.71 (Toliver Road)
Construction at the intersection of OR213 and Toliver Road is designed to remove a safety issue from a stop sign-controlled intersection. To reduce the high rate of crashes, ODOT is installing a roundabout. A roundabout will improve safety by reducing sharp turns while also accommodating the type of traffic that uses it. Constructing the roundabout requires widening the intersection at Toliver Road and replacing an existing culvert carrying Bear Creek under Oregon 213. Work in the creek must be done during low-water level periods in the summer. The project required a full closure of the intersection of OR 213 and Toliver Road for much of the 2023 summer.
- Excavation 4,000 cy
- Storm drain 1,600 lf
- 6’ x 4’ Box culvert 120 lf
- Aggregate base 4,600 tons
- Asphalt paving 3,300 tons
- Concrete surfacing 2,900 sy
The Kerr Way
Kerr Contractors meets all challenges as a team. This includes specialists from within the organization and from trusted resources outside the company. Teams built from from the same values and corner stone produce high quality with speed.
Everything we do is based upon the simple idea that we do the right thing for our customer, no matter the cost. We do this for ourselves and everyone we work with on the team.
Kerr Contractors was founded on the belief that finding a better way is not just a matter of distinction, but of survival. The culture is built upon the passion of finding a better way to deliver everything we do.
Each action builds on the idea that you own it until you deliver it. The culture that permeates the company strives to hold everyone accountable and to set a high standard of conduct and accomplishment.
Your success is built upon enduring relationships with trusted construction specialists. These strong relationships deliver value to the customer and spawn future growth and opportunity.