N.W. Martin Road – Hwy 47 – Verbort Road
The intersection work included the installation of a roundabout, the replacement of two culverts with a bridge, and the widening of shoulders on Martin Road. Construction required a bypass lane on Hwy 47 during the construction of the roundabout. N.W. Martin Road was closed during the reconstruction of the existing roadway and the construction of a new bridge over Council Creek. Structure work for the bridge was challenged by low high voltage power lines.
- Excavation 12,000 cy
- Storm drain 2,500 lf
- Bridge piling 948 lf, 50 ft long two-lane bridge
- Aggregate base 13,000 tons
- Asphalt paving 6,800 tons
- Extensive water quality and treatment facilities
The Kerr Way
Kerr Contractors meets all challenges as a team. This includes specialists from within the organization and from trusted resources outside the company. Teams built from from the same values and corner stone produce high quality with speed.
Everything we do is based upon the simple idea that we do the right thing for our customer, no matter the cost. We do this for ourselves and everyone we work with on the team.
Kerr Contractors was founded on the belief that finding a better way is not just a matter of distinction, but of survival. The culture is built upon the passion of finding a better way to deliver everything we do.
Each action builds on the idea that you own it until you deliver it. The culture that permeates the company strives to hold everyone accountable and to set a high standard of conduct and accomplishment.
Your success is built upon enduring relationships with trusted construction specialists. These strong relationships deliver value to the customer and spawn future growth and opportunity.