Low Head Flow Pipe
This was a best-value project. Work included installation of 7,500 lineal feet of 36″ and 6,240 lineal feet 42″ low flow pipe in a former open canal to enclose system and reduce leakage. The Owner scheduled all pipe to be installed outside normal irrigation season. More importantly, all pipe must be installed within one – two week period. The Owner selected a contractor based upon their ability to demonstrate past experience and the ability to perform all work within the required time frame. Kerr Contractors was the selected contractor.
The Kerr Way
Kerr Contractors meets all challenges as a team. This includes specialists from within the organization and from trusted resources outside the company. Teams built from from the same values and corner stone produce high quality with speed.
Everything we do is based upon the simple idea that we do the right thing for our customer, no matter the cost. We do this for ourselves and everyone we work with on the team.
Kerr Contractors was founded on the belief that finding a better way is not just a matter of distinction, but of survival. The culture is built upon the passion of finding a better way to deliver everything we do.
Each action builds on the idea that you own it until you deliver it. The culture that permeates the company strives to hold everyone accountable and to set a high standard of conduct and accomplishment.
Your success is built upon enduring relationships with trusted construction specialists. These strong relationships deliver value to the customer and spawn future growth and opportunity.