Dawson Creek Pump Station
CleanWater Services, the largest Sewerage Agency in the Portland Metropolitan area, constructed a new pump station and twin force main. This was a best-value project. CleanWwater Services selected a contractor based upon their experience in pipeline and pump station construction. Other requirements of the project included the installation of a secant pile wall to shore the pump station during excavation and construction, as well as act as a launch pit for a 42″ micro tunnel below Brookwood Parkway. Another significant project requirement was the construction of a pipe bridge over the active Tri-Met light rail tracks. Kerr Contractors was the selected contractor for this work.
- New pump station with 3 – 135 Hp motors
- 150 ft of 42” micro tunnel
- 30 ft deep, 40 ft diameter secant pile bore pit
- 180 gy pipe bridge across Tri Met Max tracks
- 6,200 ft of dual 32” pvc force main
The Kerr Way
Kerr Contractors meets all challenges as a team. This includes specialists from within the organization and from trusted resources outside the company. Teams built from from the same values and corner stone produce high quality with speed.
Everything we do is based upon the simple idea that we do the right thing for our customer, no matter the cost. We do this for ourselves and everyone we work with on the team.
Kerr Contractors was founded on the belief that finding a better way is not just a matter of distinction, but of survival. The culture is built upon the passion of finding a better way to deliver everything we do.
Each action builds on the idea that you own it until you deliver it. The culture that permeates the company strives to hold everyone accountable and to set a high standard of conduct and accomplishment.
Your success is built upon enduring relationships with trusted construction specialists. These strong relationships deliver value to the customer and spawn future growth and opportunity.